THE PROJECT
Project features
In compliance with regulations, the operational capacity of the port terminal will be increased to establish the Port of Montevideo as a regional hub for container operations:
- Expanding the terminal by approximately 23 hectares, until completing the entire concession area.
- Constructing the West Pier, approximately 730m in length.
- Incorporating a large amount of cutting-edge equipment.
Construction Phase Duration and Employment Sources
The project is expected to be constructed over a duration of 42 months (with the inauguration of the first phase by the end of 2024), employing 500 people during construction, most of them from the metropolitan area of Montevideo.
Public Hearing
Access the presentation (in spanish) made during the hearing held on 04/24/2023 and additional information (in spanish).
SAFETY VIDEO
Through this video, visitors to the site where the expansion works of the specialized container terminal are carried out can learn about the safety regulations and precautions that we use.
SARANDÍ BREAKWATER
Protection
To protect the Sarandí Breakwater, a “combi-wall” type pile-wall will be constructed before dredging begins to reinforce it. The work will not be adjacent; there will be a water channel between the container terminal and the breakwater itself.
Improvements to the Fishing Promenade
The breakwater will be reconditioned with pavement, lighting, and installation of street furniture, allowing for the enhancement of this traditional public space.
.
Accessibility During the Work
Throughout the construction, the breakwater will remain fully accessible to the public, except during the execution of protection works. During that stage, public access will only be restricted to the final 250 meters for a period of three to six months (over 70% of its length will still be accessible during those months).
LOOKOUT “MIRADOR” BUILDING
Two new publicly accessible spaces will be created, complementing the Rambla and the Sarandí Breakwater:
• A green area facing the promenade with a conference room for 100 people , with coordinated access for community organizations.
• A 22m high viewpoint with a capacity for 90 people , allowing for 360° views of the city and the bay.
Recovered Views for the City
The construction of the lookout building will allow the recovery and enhancement of the views of the Montevideo hill and the sunset from the terrace, as well as the view of port operations.
You can also see the Old City to the center of Montevideo and the southern boulevard.
Hill of Montevideo and sunset.
View of port operations.
Old City to the center of Montevideo.
South boulevard.
CONTACT
(Fields marked with * are required)
